|
Site |
Proposal |
Est. of housing provision/employment floorspace |
Policy considerations/things to be provided for by the development |
1 |
Woolacombe Road, Bere Alston
|
Housing |
30 homes |
- Layout, design and location of structural landscaping to be guided by landscape assessment.
- Mitigation of recreational impact on SAC.
- Contribution towards rail link between Tavistock and Bere Alston.
- Ensuring that proposals are well integrated with the existing development.
|
2 | South of Woolacombe
Road, Bere
Alston
| Housing | 20 homes |
- Layout, design and location of structural landscaping to be guided by landscape
assessment.
- Mitigation of recreational impact on SAC.
|
3 | Beacon Park,
Dartington
| Employment
(Use
Classes
B1b,c,B2
and B8) | 11,300 sq.m.
employment
floorspace |
- Appropriate landscaping to address the prominence and scale of development.
- Appropriate flood risk mitigation measures.
- Improved pedestrian and cycle
connectivity with the Dartington Estate
and village centre.
|
4 |
Brimhay Bungalows, Dartington
| Housing | 14 homes
| - Demolition of existing housing and remediation of land.
- Measures to avoid and mitigate
biodiversity impact, including protection
of woodland and minimising lighting.
- Re-provision of community housing.
- Retention of Public Right of Way.
|
5 |
Broom Park, Dartington
| Housing | 80 homes |
- Footpath and cycle access to the main road, connecting to the NCN and on
towards the village centre.
- An overall site layout and design that respects the setting of the existing housing at Broom Park.
- Retention and future management of the hedgerow along the western boundary.
- Additional strategic landscaping on the western side of the site to soften the edges of the development onto the undeveloped countryside beyond.
- Appropriate flood risk mitigation measures.
- Acceptable impact on the setting of St Mary's Church to the east, which necessitates both strategic landscaping that is sensitive to this context as well as an appropriate extent, scale, layout, design and materials.
|
6 | Higher Tweed
Mill,
Dartington | Employment
(Use Class
B1) | 500 sq.m. employment floorspace
| - Footpath and cycle access to the main
road, connecting on towards the village
centre and National Cycle Network.
- Retention and future management of the
hedgerow at edges of the site.
- Additional strategic landscaping soften
the edges of the development onto the undeveloped countryside.
- Locally distinctive frontages.
|
7 | Sawmills Field,
Dartington
| Housing | 40 homes |
- Footpath and cycle access to the main
road, connecting on towards the village
centre and National Cycle Network. - Retention and future management of the hedgerow along the western boundary and of the tree-belt on the northern part of the site.
- Additional strategic landscaping to the western site boundary to soften the edges of the development onto the undeveloped countryside.
- Provision of locally distinctive frontages onto movement routes, especially the main A385.
|
8 |
Hatherleigh
Market,
Hatherleigh
| Mixed use -
with homes
and
employment
(Use
Classes B1,
B2 and B8) | 106 homes;
880 sq.m.
employment
floorspace (no net
increase) |
- Regeneration of existing site to make
more efficient use of land including
demolition of buildings as appropriate. - Retail uses where there is no adverse
impact on the town centre.
- New public realm including Market Square
with associated Pavilion.
- Contributions to expanding primary school
capacity in the area.
- Public and private car parking, and
associated Infrastructure.
- Appropriate flood risk mitigation
measures.
|
9 |
Hatchmoor,
Hatherleigh
| Mixed use -
with homes
and
emloyment
use (B1, B2) | 50 homes; 8,000 sq.m. employment
floorspace
| - Layout and design to be guided by landscape assessment.
- Creation of a high quality 'gateway' to the
village.
- Contributions to expanding primary school capacity in the area.
|
10 | Glenhaven, Lifton
| Housing | 100 homes |
- Layout and design to be guided by
landscape and heritage assessment. - Creation of a high quality 'gateway' to the
village.
- Contributions to expanding primary school
capacity in the area.
|
11 |
Land adjacent
to Lifton Farm
Shop, Lifton
| Employment (Use Class
B2, B8) | 14,400 sq.m. |
- Support and promote local tourism
initiatives. - Provide flexible office spaces and/or light
industrial units; and/or
- Enable complementary uses such as craft
workshops.
|
12 |
West of Palm
Cross,
Modbury
| Mixed use -
with homes
andemployment (Use Class B1) | 92 homes; 1,900
sq.m. employment
floorspace |
- Sensitive and high quality design which
conserves and enhances the heritage
assets. - Layout and design to be guided by
landscape assessment.
- Strategic landscaping and open space to
the north and east of the site, linked to the
open space to the north east of the site
at West Barracks Road.
|
13 |
Pennpark, Modbury
| Housing | 40 homes |
- Sensitive and high quality design which
conserves and enhances the heritage
assets.
- Layout and design to be guided by
landscape assessment.
|
14 |
West of Barracks
Road,
Modbury
| Housing | 40 homes |
- Sensitive and high quality design which
conserves and enhances the heritage
assets.
- Layout, design and landscaping to be
guided by landscape assessment, with
careful consideration of scale and
appearance of development, and the
lighting of the site, to minimise wider
landscape impacts.
|
15 |
Batheway
Fields, North
Tawton
| Mixed use -
with homes
and employment
(Use Class
B1) | 61 homes; 1,300
sq.m. employment
floorspace |
- Layout and design to be guided by
landscape assessment.
- Creation of a high quality 'gateway' to the
town.
- Contributions to expanding primary school
capacity in the area.
|
16 |
Bonfire Hill, Salcombe
| Housing | 13 homes | - Sensitive and high quality design which
conserves and enhances the heritage
assets.
- Layout and design to be guided by
landscape assessment.
- Strategic landscaping bordering the site.
- Careful consideration of the scale and
appearance of the development, and the
lighting of the site, to minimise wider
landscape impacts.
- No exacerbating of water quality issues
within the Salcombe to Kingsbridge SSSI.
|
17 |
Shadycombe,
Salcombe
| Mixed use -
with homes
and employment
(Use
Classes B1) | 20 homes; 2,000
sq.m. employment
floorspace |
- Sensitive and high quality design which
conserves and enhances the heritage
assets.
- Layout and design to be guided by
landscape and heritage assessment, with
careful consideration of scale and
appearance of development and any
ground engineering operations, to
minimise wider landscape impacts.
- No exacerbating of water quality issues
within the Salcombe to Kingsbridge SSSI.
- Appropriate flood risk mitigation
measures.
|
18 |
Land West of West End
Garage,
Salcombe
| Housing | 20 homes |
- Strategic landscaping to address the sites
prominence, to help mitigate any adverse
visual impact on the AONB, and to soften
the edges of the development onto the
undeveloped countryside. The scale,
design and density of development should
ensure that it is not overly prominent when
viewed from the surrounding countryside.
- A lighting strategy, which minimises the
impact of light spill to the surrounding
countryside.
- No exacerbating of water quality issues
within the Salcombe to Kingsbridge SSSI.
- Careful consideration of extent, scale and
appearance of development to minimise
local landscape impacts.
|
19 |
Green Park Way,
Chillington
| Housing | 65 homes |
- Recognising and enhancing the
relationship with the South Devon AONB,
with careful consideration of scale, height,
density, appearance and lighting of
development, and strategic landscaping
to minimise wider landscape impacts.
- Mitigation of highway impacts, including
safety and congestion.
- Provision and maintenance of a surface
water drainage scheme.
|
20 |
North of
Milizac Close,
Yealmpton
| Employment
(Use
Classes
B1b,c, B2,
B8) | 2,500 sq.m.
employment
floorspace |
- Recognising and enhancing the
relationship with the South Devon AONB,
with careful consideration of scale, height,
density, appearance and lighting of
development, and strategic landscaping
to minimise wider landscape impacts.
|
21 |
North of
Riverford
Farm Shop,
Yealmpton
| Employment
(Use
Classes
B1b,c, B2,
B8) | 4,000 sq.m.
employment
floorspace |
- Recognising and enhancing the
relationship with the South Devon AONB,
with careful consideration of scale, height,
density, appearance and lighting of
development, and strategic landscaping
to minimise wider landscape impacts.
|